Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(9 citation statements)
references
References 9 publications
0
9
0
Order By: Relevance
“…e fundamental and direct impact of COVID-19 on tunnel construction was schedule delay. Similar to traditional risk impacts identified in studies such as Pehlivan andÖztemir [37], Hossen et al [32], and Eshtehardian and Khodaverdi [27], shortage of workers, materials, machines, and site accessibility had greatly hindered the schedule of the tunnel construction projects at the early outbreak of the COVID-19 epidemic in China. To catch up with the schedule delay, different strategies were implemented to address the risk issues identified.…”
Section: E Impacts Of Covid-19 On Tunnel Construction Projectsmentioning
confidence: 71%
“…e fundamental and direct impact of COVID-19 on tunnel construction was schedule delay. Similar to traditional risk impacts identified in studies such as Pehlivan andÖztemir [37], Hossen et al [32], and Eshtehardian and Khodaverdi [27], shortage of workers, materials, machines, and site accessibility had greatly hindered the schedule of the tunnel construction projects at the early outbreak of the COVID-19 epidemic in China. To catch up with the schedule delay, different strategies were implemented to address the risk issues identified.…”
Section: E Impacts Of Covid-19 On Tunnel Construction Projectsmentioning
confidence: 71%
“…In the past literature, many studies have been found that have recommended an integrated simulation approach into project risk assessment, as this approach accounts explicitly for the effects of uncertainty in the project (Fang and Marle, 2012; Peleskei et al , 2015; Satumtira and Dueñas-Osorio, 2010). In a recent study, Pehlivan and Öztemir (2018) developed a simulation model to measure the impact of schedule delays on cost overrun. This model applies a risk integration approach in generating random scenarios and computes the cost impact of a delayed milestone in the expected budget.…”
Section: Applications Of Ai Methodsmentioning
confidence: 99%
“…The complex and dynamic nature of construction projects have been encountered by a series of cost overrun issues over the years. This cost failure is because of the presence of complexity and uncertainty in a project system (Pehlivan and € Oztemir, 2018). Where there is uncertainty about ground conditions, accurate project costing cannot be achieved.…”
Section: Introductionmentioning
confidence: 99%
“…Transnational railway construction projects are not peaceful for government and engineering managers because they face various risks such as economic, environmental, technology, integrated and social risks (Dong et al , 2018; Pehlivan and Öztemir, 2018). They are even riskier than domestic construction projects because of different institutional environments, cultures, political, legal and socioeconomic conditions in the host countries (Gunhan and Arditi, 2005; Al-Sabah et al , 2014).…”
Section: Introductionmentioning
confidence: 99%