2002
DOI: 10.1049/ip-gtd:20020081
|View full text |Cite
|
Sign up to set email alerts
|

Integrated reliability evaluation of generation, transmission and distribution systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
3
0
4

Year Published

2010
2010
2023
2023

Publication Types

Select...
3
3
1

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(7 citation statements)
references
References 11 publications
0
3
0
4
Order By: Relevance
“…10 shows the impact of each load point and each wind speed modelling technique on the system reliability indices, namely, the SAIFI. It is noted that the impact of wind models is minimum on industrial customers (8,9,10,26,27,28,29,30,31) and maximum on the commercial customers (6,7,16,17,24,25,38).…”
Section: Reliability Analysis Of a Roy Billinton Test System (Rbts) Smentioning
confidence: 99%
See 1 more Smart Citation
“…10 shows the impact of each load point and each wind speed modelling technique on the system reliability indices, namely, the SAIFI. It is noted that the impact of wind models is minimum on industrial customers (8,9,10,26,27,28,29,30,31) and maximum on the commercial customers (6,7,16,17,24,25,38).…”
Section: Reliability Analysis Of a Roy Billinton Test System (Rbts) Smentioning
confidence: 99%
“…Different measures were used to assess the impact of the wind speed models on the local and system reliability indices, namely the average interruption duration (AID), the average interruption frequency (AIF), the system AIF index (SAIFI), and the system AID index (SAIDI). These reliability measures have been explained in detail in relevant literature [30,31].…”
Section: Introductionmentioning
confidence: 99%
“…The reliability assessment of distribution networks may be classified into three categories: analytical methodologies, Monte Carlo simulations (MCS), and a combination of both (Billinton and Allan 1996;Billinton and Wenyuan 1994;Leite da Silva et al 2002a, 2005Allan and da Silva 1995). For the purpose of predicting reliability performance, most target indices are average values and, therefore, analytical based tools will contemplate risk assessment.…”
Section: Introductionmentioning
confidence: 99%
“…Os resultados apontam uma redução dos indicadores de continuidade, colaborando assim na eficaz gestão do sistema elétrico e na mitigação dos prejuízos econômicos associados às interrupções de energia. [13].…”
Section: Agradecimentosunclassified