2012
DOI: 10.1080/09544828.2011.629317
|View full text |Cite
|
Sign up to set email alerts
|

Integrated product relationships management: a model to enable concurrent product design and assembly sequence planning

Abstract: This version is available at https://strathprints.strath.ac.uk/41778/ Strathprints is designed to allow users to access the research output of the University of Strathclyde. Unless otherwise explicitly stated on the manuscript, Copyright © and Moral Rights for the papers on this site are retained by the individual authors and/or other copyright owners. Please check the manuscript for details of any other licences that may have been applied. You may not engage in further distribution of the material for any pro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
36
0
1

Year Published

2012
2012
2023
2023

Publication Types

Select...
4
1
1

Relationship

4
2

Authors

Journals

citations
Cited by 40 publications
(37 citation statements)
references
References 41 publications
0
36
0
1
Order By: Relevance
“…As 299 such and according to the aforementioned PASODE steps, PROMA 300 will manage the information propagation through design and 301 manufacturing data structures (i.e. eBOM, CADBOM and mBOM) by 302 using the Bill Of Relations (BOR) concept [11]. In order to facilitate 303 understanding, this paper only describes and focuses on the 304 relationships identified between product design and assembly 305 sequence planning phases as an example of lifecycle activity to 306 illustrate the PROMA philosophy.…”
mentioning
confidence: 99%
See 4 more Smart Citations
“…As 299 such and according to the aforementioned PASODE steps, PROMA 300 will manage the information propagation through design and 301 manufacturing data structures (i.e. eBOM, CADBOM and mBOM) by 302 using the Bill Of Relations (BOR) concept [11]. In order to facilitate 303 understanding, this paper only describes and focuses on the 304 relationships identified between product design and assembly 305 sequence planning phases as an example of lifecycle activity to 306 illustrate the PROMA philosophy.…”
mentioning
confidence: 99%
“…This becomes a barrier for 28 applying an efficient concurrent engineering philosophy in BOL 29 and remains a huge challenge to be tackled [9,10]. 30 Previous work argued that companies required efficient concur-31 rent engineering (CE) [12] and PLM strategies [11] in order to 32 maintain their business competitive edge. One particular industrial 33 requirement is the need for concurrent considerations of lifecycle 34 issues for different life aspects into the early product design process 35 [13][14][15].…”
mentioning
confidence: 99%
See 3 more Smart Citations