2023
DOI: 10.1007/s13399-023-04333-3
|View full text |Cite
|
Sign up to set email alerts
|

Integrated modified septic tank and constructed wetland: an alternative green technology for phytoremediation of highly polluted leachate

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 33 publications
0
2
0
Order By: Relevance
“…Thus, the selection of appropriate plant species is a key design factor that must be considered when designing Engineered Constructed Wetlands (E-CWs) in order to greatly enhance their e ciency 20 . However, eld measurement approaches require a signi cant amount of time for long-term water quality assessments, despite their predominance in recent research 21 . Furthermore, in addressing the complexities of designing CWs across varied types, sizes, and technological processes, the use of physical simulation experiments and onsite measurements often presents prohibitive costs and practical challenges.…”
Section: Introductionmentioning
confidence: 99%
“…Thus, the selection of appropriate plant species is a key design factor that must be considered when designing Engineered Constructed Wetlands (E-CWs) in order to greatly enhance their e ciency 20 . However, eld measurement approaches require a signi cant amount of time for long-term water quality assessments, despite their predominance in recent research 21 . Furthermore, in addressing the complexities of designing CWs across varied types, sizes, and technological processes, the use of physical simulation experiments and onsite measurements often presents prohibitive costs and practical challenges.…”
Section: Introductionmentioning
confidence: 99%
“…Thus, the selection of appropriate plant species is a key design factor that must be considered when designing Engineered Constructed Wetlands (E-CWs) in order to greatly enhance their efficiency (Chen et al, 2024). However, field measurement approaches require a significant amount of time for long-term water quality assessments, despite their predominance in recent research (Samadi et al, 2023). Furthermore, in addressing the complexities of designing CWs across varied types, sizes, and technological processes, the use of physical simulation experiments and onsite measurements often presents prohibitive costs and practical challenges.…”
Section: Introductionmentioning
confidence: 99%