2022
DOI: 10.1016/j.egyr.2022.02.101
|View full text |Cite
|
Sign up to set email alerts
|

Integrated life cycle assessment of a southern European house addressing different design, construction solutions, operational patterns, and heating systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…As life cycle assessment can quantify not only the manufacturing process consumption and emissions but also those of upstream processes and end-of-life, life cycle assessment will provide a powerful tool to support better green construction management from a broader perspective, such as the material production stage for construction activities (Braulio-Gonzalo et al 2022;Desai and Bheemrao 2022;Dong et al 2018;Monteiro and Soares 2022;Shafique et al 2020;Wang et al 2020b). Fig.…”
Section: Life Cycle Assessment and Green Constructionmentioning
confidence: 99%
“…As life cycle assessment can quantify not only the manufacturing process consumption and emissions but also those of upstream processes and end-of-life, life cycle assessment will provide a powerful tool to support better green construction management from a broader perspective, such as the material production stage for construction activities (Braulio-Gonzalo et al 2022;Desai and Bheemrao 2022;Dong et al 2018;Monteiro and Soares 2022;Shafique et al 2020;Wang et al 2020b). Fig.…”
Section: Life Cycle Assessment and Green Constructionmentioning
confidence: 99%
“…Considering the applied LCA methodology reference (see Figure 9a) it was found that most papers were referencing the ISO standards for LCA (ISO 14040/44), either as a sole methodologi- Looking at Figure 8c, it is seen that most studies (n = 53) assess CE solutions up front, using, e.g., recycled waste in new materials or structures [39], recycled concrete in aggregates [40], or reusing cut-offs from the automotive industry, or offal, in new building façade designs [41]. Some (n = 17) assessed prospective CE actions, e.g., through adaptable design and DfD [42][43][44][45][46][47][48], and the rest (n = 15) assessed both up front and prospectively, e.g., through cases that both used secondary materials and were designed for recycling or reuse [33,37,[49][50][51].…”
Section: Synthesis Of Included Studiesmentioning
confidence: 99%