2016
DOI: 10.7763/lnse.2016.v4.214
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Framework of Agile and CMMI: An Alternative Path towards Product Focused SPI for Small Companies

Abstract: Abstract-Developing quality software product is a challenging activity and yet necessary asset for most software companies especially small and medium size companies. For a Software process improvement (SPI) activity to be effective in such companies, the day to day product-focused activities needs to align with SPI activity.Different process maturity models have been developed, among them the Capability Maturity Model Integration (CMMI) is the most widely used process maturity framework. However, it is consid… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
8
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
3
2
1

Relationship

2
4

Authors

Journals

citations
Cited by 6 publications
(9 citation statements)
references
References 11 publications
1
8
0
Order By: Relevance
“…Accordingly, research findings related with combining some agile methodologies with the KPAs in the CMMI framework have demonstrated the two approaches can work together and can also be even better if they are implemented thoughtfully than they are individually [9,11,12,19]. In line with this, the attempts made and the results obtained have shown tangible evidence of achievements in software development and SPI through combining CMMI and agile methods.…”
Section: Related Worksupporting
confidence: 69%
See 2 more Smart Citations
“…Accordingly, research findings related with combining some agile methodologies with the KPAs in the CMMI framework have demonstrated the two approaches can work together and can also be even better if they are implemented thoughtfully than they are individually [9,11,12,19]. In line with this, the attempts made and the results obtained have shown tangible evidence of achievements in software development and SPI through combining CMMI and agile methods.…”
Section: Related Worksupporting
confidence: 69%
“…In this research the PIPIW include process improvement steps and guidelines from the integrated capability improvement framework and SPI tracking model defined and explained earlier in our earlier phase of research [12]. The post-iteration workshop technique is used for this research to review activities of the previous iteration of the project and provide a mechanism for the team members to identify positive and negative aspects or difficulties to be improved in the next iteration.…”
Section: The Post Iteration and Process Improvement Workhop (Pipiw)mentioning
confidence: 99%
See 1 more Smart Citation
“…The approach proposes to institutionalize practices of agile methods in a based on the CMMI framework of software process improvement. The detailed description of the framework is covered in an earlier publication of the first part of the research [26]. Among the CMMI approaches of SPI, the CMMI v1.3 continuous representation of process improvement is used.…”
Section: Integrated Process Improvement Frameworkmentioning
confidence: 99%
“…Improving capability of specific practices can be implemented through institutionalization of the agile practices. The tracking model developed and discussed in detail in the earlier phase of this research used to track and display the capability level of a given KPA [26]. The graph is designed to visually demonstrate the status of KPAs through their corresponding specific practices.…”
Section: Integrated Process Improvement Frameworkmentioning
confidence: 99%