Integrated Electricity and Natural Gas System for Day-Ahead Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
2
1

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 22 publications
0
2
0
Order By: Relevance
“…SCP with initial point achieved by the penalty function is denoted as penalty function (PF) initial. Zero initial means SCP with zero initial points [56]. The gap of the proposed method reduces greatly, and the accuracy will converge 5 iterations later.…”
Section: Impact Due To Congestion and Demand Responsementioning
confidence: 94%
“…SCP with initial point achieved by the penalty function is denoted as penalty function (PF) initial. Zero initial means SCP with zero initial points [56]. The gap of the proposed method reduces greatly, and the accuracy will converge 5 iterations later.…”
Section: Impact Due To Congestion and Demand Responsementioning
confidence: 94%
“…Many options are being studied for grid-scale storage. For example, power to gas (PtG) is a technology that could be useful in the short to medium term as a component of a comprehensive grid-scale storage solution in support of a power grid to accommodate intermittent renewable energy resources [4][5][6][7]. At the same time, microgrids have attracted wide attention as an integrated technology including renewable energy and other distributed power sources [8,9].…”
Section: Introductionmentioning
confidence: 99%