2012
DOI: 10.13182/nt12-a13482
|View full text |Cite
|
Sign up to set email alerts
|

Integral Effect Tests on Transient Thermal-Hydraulic Behavior during a Steam Generator Tube Rupture Accident in the APR1400

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…A typical measured primary pressure for a single U-tube rupture is shown in Figure 25. In this figure, AFAS stands for Auxiliary Feedwater Actuation Signal and it implies that auxiliary feedwater was provided into the intact steam generator between 3153 s and 3911 s. More information can be found in the literature [25]. The typical sequence of events was experimentally identified.…”
Section: Steam Generator Tube Rupture (Sgtr)mentioning
confidence: 99%
“…A typical measured primary pressure for a single U-tube rupture is shown in Figure 25. In this figure, AFAS stands for Auxiliary Feedwater Actuation Signal and it implies that auxiliary feedwater was provided into the intact steam generator between 3153 s and 3911 s. More information can be found in the literature [25]. The typical sequence of events was experimentally identified.…”
Section: Steam Generator Tube Rupture (Sgtr)mentioning
confidence: 99%