2008
DOI: 10.48550/arxiv.0810.0646
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

INTEGRAL Cross-calibration Status: Crab observations between 3 keV and 1 MeV

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
5
0

Year Published

2009
2009
2011
2011

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(6 citation statements)
references
References 0 publications
1
5
0
Order By: Relevance
“…332, 333, 335, 664, 673 and 675 (see Table 3). The cross-calibration studies on the JEM-X and IBIS/ISGRI detectors have been done by Jourdain et al (2008) using the Crab observation data. The calibration between JEM-X and IBIS/ISGRI for OSA 7.0 can be good enough within ∼ 6%.…”
Section: Quiescent Statesmentioning
confidence: 99%
“…332, 333, 335, 664, 673 and 675 (see Table 3). The cross-calibration studies on the JEM-X and IBIS/ISGRI detectors have been done by Jourdain et al (2008) using the Crab observation data. The calibration between JEM-X and IBIS/ISGRI for OSA 7.0 can be good enough within ∼ 6%.…”
Section: Quiescent Statesmentioning
confidence: 99%
“…Moreover, the SPI detector was carefully calibrated before the launch of INTEGRAL (Attié et al 2003), which ensured that the calibration check was independent of the details of the particular model assumed for a calibration source such as the Crab. A lot of effort has been invested since the beginning of the mission to calibrate well the ISGRI and SPI instruments, resulting in a good performance in the energy range below 100 keV (Jourdain et al 2008). Due to a limited ISGRI sensitivity above 100 keV, there is however still a spectral slope issue remaining for the high energy part of the spectra.…”
Section: Calibrationmentioning
confidence: 99%
“…However, the latter value is clearly higher than Γ ≈ 2.2 inferred from the Crab spectral analysis with the standard OSA SPI software, provided in its version 7.0 and several earlier releases. The latest INTEGRAL cross-calibration report (Jourdain et al 2008) presented a new result for SPI: with the updated spectral extraction software used Table 4. Cross-calibration between the INTEGRAL high-energy instruments.…”
Section: Calibrationmentioning
confidence: 99%
See 1 more Smart Citation
“…For both the ISGRI and the SPI data, we follow the INTEGRAL Cross-calibration status document by Jourdain et al (2008) and assume the Crab Nebula spectrum between 25 keV and 1 MeV to be a broken powerlaw with break energy fixed at 100 keV (which is close to the break energy we actually measure, see Sect. 4.1).…”
Section: Statistical and Systematic Errorsmentioning
confidence: 99%