2010
DOI: 10.1016/j.ipl.2010.04.004
|View full text |Cite
|
Sign up to set email alerts
|

Integer SEC-DED codes for low power communications

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
12
0

Year Published

2011
2011
2021
2021

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 14 publications
(13 citation statements)
references
References 4 publications
(4 reference statements)
0
12
0
Order By: Relevance
“…The proposed code is stated to have linear time com- From the relation k = 2 b−2 [1] it follows that b = ld(k) + 2, so the number of operations required is k · (4 · b + 1) = k · (4 · ld(k) + 1). Asymptotically, the complexity of the code from [1] is not linear but O(k · ld(k)).…”
Section: Code Complexitymentioning
confidence: 99%
See 1 more Smart Citation
“…The proposed code is stated to have linear time com- From the relation k = 2 b−2 [1] it follows that b = ld(k) + 2, so the number of operations required is k · (4 · b + 1) = k · (4 · ld(k) + 1). Asymptotically, the complexity of the code from [1] is not linear but O(k · ld(k)).…”
Section: Code Complexitymentioning
confidence: 99%
“…A recently published contribution [1] proposes a (k + 2, k) error control block code for communication systems that corrects a single bit error and detects double bit errors. The code length is k = 2 b−2 and b is an arbitrary byte length.…”
Section: Introductionmentioning
confidence: 99%
“…At present, the development of China's power industry in order to supply the main guide mainly oriented to the needs of the transition period, the accurate prediction of power load of great significance to the achievement of sustainable development of power industry [9,10]. This paper focuses on two types of fuzzy system identification, pointing out the deficiencies of stage presence, the type two fuzzy measure is applied to the two type of fuzzy system identification Electric power load forecast is the power system planning, construction, operation, maintenance of production, as well as an important basis for the safe operation of the electric power load fluctuation, and has strong uncertainty, it is difficult to predict.…”
Section: Introductionmentioning
confidence: 99%
“…Currently many scholars to spare no effort to study load forecasting, a more advanced theories and methods to improve the forecast accuracy, provide a powerful guarantee for the economy and security of power system operation. But because too many random factors load, highly nonlinear, and theoretical methods, there are still some traditional limitations and other issues, the new theory and new technology has been promoting the continuous development of load forecasting [8][9].…”
Section: Introductionmentioning
confidence: 99%