Contemporary Topics in Ground Modification, Problem Soils, and Geo-Support 2009
DOI: 10.1061/41023(337)45
|View full text |Cite
|
Sign up to set email alerts
|

Instrumentation of MSE Wall Containing Laterally Loaded Drilled Shafts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2009
2009
2015
2015

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Movement of telltales installed within the fill and attached to the geogrid, as well as targets attached to the wall facing, was monitored using a digital camera and a photogrammetric process. Additional details on construction and instrumentation are located in Pierson (2008Pierson ( , 2009.…”
Section: Construction and Instrumentationmentioning
confidence: 99%
See 1 more Smart Citation
“…Movement of telltales installed within the fill and attached to the geogrid, as well as targets attached to the wall facing, was monitored using a digital camera and a photogrammetric process. Additional details on construction and instrumentation are located in Pierson (2008Pierson ( , 2009.…”
Section: Construction and Instrumentationmentioning
confidence: 99%
“…This method permitted essentially instantaneous measurement of displacements at multiple wall locations throughout the test, although there was a significant amount of time required for post processing. A more detailed discussion of this use of photogrammetry is discussed in Pierson (2009).…”
Section: Fig 1 Sketch Of Shaft B and Instrumentation Locationsmentioning
confidence: 99%