Abstract: The Condeep production platform was installed in the North Sea's Brentfield in Aug. 1975. The installation phase is described and the results obtained during penetration of the base into the sea bed are presented. Experience gained during this installation will be of use for further work on installing concrete gravity structures. Introduction The first concrete gravity structure installed in the northern North Sea was the Ekofisk Doris tank placed for Phillip… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1981
1981
1981
1981

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The structure survived this with only minor storm related settlements of a few tens of millimetres (Clausen et al 1975). In the first year of operation the Ekofisk tank settled a total of 250mm with most of it being "shaking down" settlement during the first 6 months (Eide and Larson 1976). In contrast the steel jacket structures being installed in the Ekofisk Oilfield were encountering difficulties with pile driving.…”
Section: Steel Piled Versus Concrete Gravitymentioning
confidence: 99%
“…The structure survived this with only minor storm related settlements of a few tens of millimetres (Clausen et al 1975). In the first year of operation the Ekofisk tank settled a total of 250mm with most of it being "shaking down" settlement during the first 6 months (Eide and Larson 1976). In contrast the steel jacket structures being installed in the Ekofisk Oilfield were encountering difficulties with pile driving.…”
Section: Steel Piled Versus Concrete Gravitymentioning
confidence: 99%