In the Llanos Norte area, ESP systems represent 92% of the installed artificial lift systems. According to the current production strategy in this field, there is a need for intervention in low quality sand. The design of the artificial lift system is affected by the uncertainty of the productivity index and expected flow rates. 25% of the completions designed for low flows have had deviations greater than or equal to 50% between the design parameters and the actual parameters. This condition has led to the search for alternatives for intervention and completion of this type of wells, this because the conventional technology of the pumps used historically in the field does not allow producing efficiently in such a wide uncertainty production ranges.
Service Provider, from the hand of the Operator implemented a pump called FLEX-ER (extended range pump). This solution allows extending the range of the efficiency cone of the pump from 50BFPD and up to 2900BFPD, this feature helps to mitigate the uncertainty in the available design parameters, keep the pump in the optimal ranges of operation, avoid the up and down wear of the stages, thus increasing the lifetime of the electrosubmersible system.
The implementation of this technology has allowed having an ESP equipment available to cover the production needs of the wells in low quality sands of northern plains. The wide range of operation of this stage allows to be protected against uncertainty in productivity and facing the changes that the well may have during its production stage. Additionally, the implementation evaluation model for 8 wells resulted in a projected saving of USD 1.4 million, as a consequence of the reduction in intervention costs, energy consumption and NPT reduction. According to these results, it is expected for the next well drilling and reconditioning campaigns, including the standardization of the technology in order to optimize the production processes of Occidental.
This paper aims to present the most important technology implementations, follow up and results as well as the impact in field performance KPI.