“…Operations in Hole 504B were carried out over eight legs (DSDP Legs 69, 70, 83, and92 andODP Legs 111, 137, 140, and148) between 1979 and (only seven of these eight legs were coring legs; Leg 92 returned to Hole 504B for downhole logging operations). The detail of operations can be consulted in the Site 504 chapters of these eight leg reports (Cann, Langseth, Honnorez, Von Herzen, White, et al, 1983;Honnorez, Von Herzen, et al, 1983;Anderson, Honnorez, Becker, et al, 1985;Leinen, Rea, et al, 1986;Becker, Sakai, et al, 1988;Becker, Foss, et al, 1992;Dick, Erzinger, Stokking, et al, 1992;Alt, Kinoshita, Stokking, et al, 1993). The full suite of operations in Hole 504B is summarized in Table T3, and major perturbing events are reported in Figure F8.…”