22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013) 2013
DOI: 10.1049/cp.2013.1074
|View full text |Cite
|
Sign up to set email alerts
|

Initial assessment of the asset management process of a large industrial plant including probabilistic reliability analysis

Abstract: Engro Fertilizer and Siemens PTI jointly completed a study on the supply reliability situation and on the asset management process in Engro Fertilizer's Daharki (Pakistan) plant. This project complemented earlier projects on, e.g., the overall design and the dynamic performance of the captive generation units in this industrial power supply system. Probabilistic reliability calculations validated that the reliability level throughout the plant is adequate and rather constant. A few individual exceptions are we… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
(1 reference statement)
0
1
0
Order By: Relevance
“…The reliability of the functioning of power systems as well as the ability to provide a reliable power supply to consumers depend on the availability of reserve OHPLs, as well as the time required to search for and eliminate a fault on OHPLs [18][19][20]. To eliminate the fault on OHPL, it is necessary to implement organizational and technical measures, which consist of the departure of the repair team to the place of fault and the implementation of emergency recovery work.…”
Section: Introductionmentioning
confidence: 99%
“…The reliability of the functioning of power systems as well as the ability to provide a reliable power supply to consumers depend on the availability of reserve OHPLs, as well as the time required to search for and eliminate a fault on OHPLs [18][19][20]. To eliminate the fault on OHPL, it is necessary to implement organizational and technical measures, which consist of the departure of the repair team to the place of fault and the implementation of emergency recovery work.…”
Section: Introductionmentioning
confidence: 99%