“…Finally, when considering the DAC reported in Figure 7, we observe that the majority of bug types have a similar delay after that the corresponding patches have been submitted. Most likely, this heavily depends on the processes adopted within the projects to control for the soundness of a patch: for instance, most of the modern projects perform code review activities of all the newly committed code changes, and have standard procedures to assess the validity of the change before integration in the code base [64]. The only exception to this general discussion is related to the configuration-issue, which takes up to 33 hours to be integrated: however, given previous findings in literature [6,53,82], we see this as an expected result because configuration-related discussions generally trigger more comments by developers since a change in configuration files might impact the entire software project.…”