2015 IEEE Power &Amp; Energy Society General Meeting 2015
DOI: 10.1109/pesgm.2015.7285924
|View full text |Cite
|
Sign up to set email alerts
|

Info-gap approach to manage GenCo's trading portfolio with uncertain market returns

Abstract: An independent Generation Company (GenCo) secures its future trading position by managing its portfolio among multiple trading options. Future returns of these trading options are not known during decision making and are traditionally estimated using probabilistic or fuzzy methods. Quantifying such uncertainty of market returns by conventional methods does not reflect the information gap existing between estimated and actual market returns. Based on quantification of this information gap, the paper proposes Ge… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…It can be used to carry out a robust decision against intense uncertain nature of the problem parameters [35]. IGDT is a non-probabilistic method that optimizes in a way to be immune again low benefits and windfall gains [36]. In this paper, an IGDT model is developed for dealing with the VEH plant with WPG uncertainty.…”
Section: B Igtd Methodsmentioning
confidence: 99%
“…It can be used to carry out a robust decision against intense uncertain nature of the problem parameters [35]. IGDT is a non-probabilistic method that optimizes in a way to be immune again low benefits and windfall gains [36]. In this paper, an IGDT model is developed for dealing with the VEH plant with WPG uncertainty.…”
Section: B Igtd Methodsmentioning
confidence: 99%
“…By the proposed IGDT-based optimal travel arrangement of the ship, the proposed model guarantees the cost-effective and reliable operation of the system. In this regard, the uncertain loads are modelled by the IGDT-based approach as (32) where the risk-seeker and riskaverse strategies can be taken by HCS to face unpredictable loading conditions [24] , and β are the forecasted load, uncertain parameter related to load and horizon of uncertainty, respectively.…”
Section: Proposed Igdt-based Risk-constrained Hcs Scheduling Strategymentioning
confidence: 99%
“…Incomes of the selling electricity and thermal energy in the energy market are given by (31) and (32), respectively [31].…”
Section: Exchange Energy With the Electrical And Thermal Energy Marketsmentioning
confidence: 99%
“…By the proposed IGDT method, decision-maker designates the target benefit and the IGDT model guarantees the objective by maximising the uncertainty horizon. The solar-based TS-CAES plant can immune itself against low benefits and windfall gains using non-probabilistic IGDT method [32]. Uncertain parameters can be modelled differently in the IGDT method [33].Here, the uncertainty related to solar farm generation is modelled by IGDT methodology.…”
Section: Risk Constraint Solar-based Ts-caes Plant Selfscheduling Promentioning
confidence: 99%