2016
DOI: 10.12736/issn.2300-3022.2016110
|View full text |Cite
|
Sign up to set email alerts
|

Influence of Power System on Operation of an HVDC Link. A Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The most dangerous short-circuits are short-circuits that cause significant voltage asymmetry at the LCC connection point. These are mainly single-phase short-circuits and especially single-phase Automatic Reclosing in Lines (ARL) connected to the LCC [9,[11][12][13]. Usually, such events are accompanied by unwanted multiple commutation failures.…”
Section: Simulation Tests For Lcc Systems During Short-circuits In Thmentioning
confidence: 99%
See 2 more Smart Citations
“…The most dangerous short-circuits are short-circuits that cause significant voltage asymmetry at the LCC connection point. These are mainly single-phase short-circuits and especially single-phase Automatic Reclosing in Lines (ARL) connected to the LCC [9,[11][12][13]. Usually, such events are accompanied by unwanted multiple commutation failures.…”
Section: Simulation Tests For Lcc Systems During Short-circuits In Thmentioning
confidence: 99%
“…The most important components of the model in the control layer are: multilayer blocks of controllers of the rectifier part and the inverter part as well as the master LCC control block. The description of the SwePol Link model is given in [9][10][11][12][13][14]. For the developed model, the LCC behavior tests were conducted during single-phase short-circuits and ARL in AC network lines.…”
Section: Simulation Tests For Lcc Systems During Short-circuits In Thmentioning
confidence: 99%
See 1 more Smart Citation