2012
DOI: 10.7494/mafe.2012.38.1.25
|View full text |Cite
|
Sign up to set email alerts
|

Influence of measurement system quality on the evaluation of process capability indices Andrzej Czarski, Piotr Matusiewicz.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 5 publications
0
7
0
Order By: Relevance
“…it is impossible to reach the full capacity of the process, unless measures for screening, continuous monitoring and improvement of the operation were carried out as a whole. Czarski & Matusiewicz (2012) using statistical control techniques in association with measurement analysis system, also found the process as incapable of producing satisfactory items regardless of the centralization of the process in the target. The same authors also reported that, due to the high values Cp and Cpk (1.17 and 1.14, respectively), adjustment measures should be performed in order to the process become capable, as the one found for speed in the rectangular plot.…”
Section: Resultsmentioning
confidence: 99%
“…it is impossible to reach the full capacity of the process, unless measures for screening, continuous monitoring and improvement of the operation were carried out as a whole. Czarski & Matusiewicz (2012) using statistical control techniques in association with measurement analysis system, also found the process as incapable of producing satisfactory items regardless of the centralization of the process in the target. The same authors also reported that, due to the high values Cp and Cpk (1.17 and 1.14, respectively), adjustment measures should be performed in order to the process become capable, as the one found for speed in the rectangular plot.…”
Section: Resultsmentioning
confidence: 99%
“…this is where one can test how the compression parameters affect the dissolution and establish a co-relation if possible. 4. Improve: Work on creating an optimum set of the key process factors which result in an improved predicted Cpk, consistent with the goal of delivering a significant improvement in process capability.…”
Section: Generate a Hypothesismentioning
confidence: 99%
“…Here, it should be emphasized that, first of all, the statistical properties decide about the quality of a measurement system and its ability for processes' monitoring with sufficient accuracy. 4 A key outcome of pharmaceutical validation studies is proving equipment, instruments and processes that are involved in the manufacture or testing of regulated materials are fit for purpose. Fit for purpose means that a system consistently performs the process it was designed to do when operated within normal limits.…”
Section: Introductionmentioning
confidence: 99%
“…A. Czarski [2] described two methods to estimate 0.135 percentile (x 0.00135 ), 99.865 percentile (x 0.99865 ) and median (x 0.5 ): Exact method and Clement's method. J.N.…”
Section: Introductionmentioning
confidence: 99%
“…Using data transformation technique, the goal is to transform the data to normal distribution, which then allows us to estimate the indices according to equations ( 1) and (2). In [4] author suggests transforming data to normal by Johnson transformation based on Johnson curves or Box-Cox transformation.…”
Section: Introductionmentioning
confidence: 99%