2021
DOI: 10.1021/acsomega.0c05386
|View full text |Cite
|
Sign up to set email alerts
|

Influence of Cement Return Height on the Wellhead Uplift in Deep-Water High-Pressure–High-Temperature Wells

Abstract: In oil and gas production in deep-water high-pressure−hightemperature (HP−HT) wells, wellhead uplift may cause the seal failure of wellbore integrity. Aiming at the oil and gas production stage in deep-water HP−HT wells, we considered the influence of cement sheath cementation and developed a model for calculating the height of wellhead uplifts, and simulation experiments for wellhead uplifts were carried out under the condition of the double pipe string at different cement return heights and multilayer pipe s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 13 publications
0
2
0
Order By: Relevance
“…After completing a stage of drilling and casing installation, cement slurry is injected into the annular space between the wellbore and casing, where it solidifies, forming a continuous and robust cement sheath. Failure to perform proper well cementing practices can lead to several problems, such as casing damage, sustained casing pressure, harmful gas and liquid leakage, , and wellhead lift . These issues can severely impact well integrity and productivity.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…After completing a stage of drilling and casing installation, cement slurry is injected into the annular space between the wellbore and casing, where it solidifies, forming a continuous and robust cement sheath. Failure to perform proper well cementing practices can lead to several problems, such as casing damage, sustained casing pressure, harmful gas and liquid leakage, , and wellhead lift . These issues can severely impact well integrity and productivity.…”
Section: Introductionmentioning
confidence: 99%
“…Failure to perform proper well cementing practices can lead to several problems, such as casing damage, 3 sustained casing pressure, 4 harmful gas and liquid leakage, 5,6 and wellhead lift. 7 These issues can severely impact well integrity and productivity.…”
Section: Introductionmentioning
confidence: 99%