Day 1 Mon, April 30, 2018 2018
DOI: 10.4043/28940-ms
|View full text |Cite
|
Sign up to set email alerts
|

Industry Limits Pushed on Cabiunas Gas Export Pipeline Project

Abstract: The Pre-Salt basin offshore Brazil provides lot of challenges in installation of pipelines and risers. As it is an area with very deep waters (>2000m) and relatively harsh wave conditions (Bi-directional waves, of annual average Hs 2m) Petrobras contracted SAIPEM FDS2 to overcome these challenges. This resulted in two records: the vertical pipe laying tension world record, and the installation of the largest, deepest and heaviest Free Standing Hybrid Riser (FSHR). The first of the two rec… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance