2010
DOI: 10.1016/j.actaastro.2010.05.010
|View full text |Cite
|
Sign up to set email alerts
|

India’s first lunar mission Chandrayaan-1 initial phase orbit determination

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
3
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…In the past, international collaboration in space explorations was not very active, but there have been notable instances. For example, Japan Aerospace Exploration Agency (JAXA)'s Kaguya [22] and Indian Space Research Organization (ISRO)'s Chandrayaan mission [23] involved a joint effort with Jet Propulsion Laboratory (JPL) for the Orbit Determination (OD). Additionally, China's Chang'e missions collaborated with the European Space Operations Center (ESOC) for telemetry and tracking services [24].…”
Section: Introductionmentioning
confidence: 99%
“…In the past, international collaboration in space explorations was not very active, but there have been notable instances. For example, Japan Aerospace Exploration Agency (JAXA)'s Kaguya [22] and Indian Space Research Organization (ISRO)'s Chandrayaan mission [23] involved a joint effort with Jet Propulsion Laboratory (JPL) for the Orbit Determination (OD). Additionally, China's Chang'e missions collaborated with the European Space Operations Center (ESOC) for telemetry and tracking services [24].…”
Section: Introductionmentioning
confidence: 99%
“…The second round of the lunar exploration climax was revived in the 1990s after a quiet period. The ESA, China, Japan, and India have carried out lunar exploration activities one after another since then [13][14][15][16][17]. Chinese lunar exploration has developed rapidly over the recent decades.…”
Section: Introductionmentioning
confidence: 99%
“…The arc length was also varied from 1-1.5 days to 3.5-4 days because of events such as maneuvers or safe modes (Mazarico et al 2018). The OD for the Chandrayaan-1 mission employed two different strategies, short arc and long arc (Vighnesam et al 2016). The short-arc OD was used for the case of subsequent maneuvers within a short period.…”
Section: Introductionmentioning
confidence: 99%