2018
DOI: 10.1504/ijpqm.2018.10014455
|View full text |Cite
|
Sign up to set email alerts
|

Increasing energy productivity in lean production system with energy oriented value-stream mapping

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…19 Best improvement plans derived to evaluate energy productivity in a automobile paint shop production system based on VSM tool. 20 There was a reduction in lead time from 20,550 min to 7069 min, in the total inventory from 1020 to 231 and in WIP from 163 to 27 units in a gear manufacturing company through application of VSM tools that includes kanban, TPM and 5S. 21 Lean-Kaizen concept was applied in a shaft swing arm company using VSM for eliminating waste.…”
Section: Literature Reviewmentioning
confidence: 99%
“…19 Best improvement plans derived to evaluate energy productivity in a automobile paint shop production system based on VSM tool. 20 There was a reduction in lead time from 20,550 min to 7069 min, in the total inventory from 1020 to 231 and in WIP from 163 to 27 units in a gear manufacturing company through application of VSM tools that includes kanban, TPM and 5S. 21 Lean-Kaizen concept was applied in a shaft swing arm company using VSM for eliminating waste.…”
Section: Literature Reviewmentioning
confidence: 99%
“…It includes the waste of waiting time, transportation usage, inventory, over-process, over-motion, and defect products (14) (15) (16). Value Stream Mapping (VSM) is one of the lean manufacturing tools or methods that has pictures from all activities (named value added and non-value added) (17) (18). It is needed to carry the products or services to the customers (19).…”
Section: Literature Reviewmentioning
confidence: 99%