2014
DOI: 10.1109/tvt.2014.2352413
|View full text |Cite
|
Sign up to set email alerts
|

Incorporating Customer Reliability Cost in PEV Charge Scheduling Schemes Considering Vehicle to Home Capability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 29 publications
(15 citation statements)
references
References 22 publications
0
14
0
Order By: Relevance
“…Min Battery degration+electricity cost [196] Augmented epsilon-constrain Min operation+interruption cost [197] MILP Max energy utilization [198] Quadratic programming…”
Section: Outage Managementmentioning
confidence: 99%
“…Min Battery degration+electricity cost [196] Augmented epsilon-constrain Min operation+interruption cost [197] MILP Max energy utilization [198] Quadratic programming…”
Section: Outage Managementmentioning
confidence: 99%
“…EV is utilised in reducing peak load demand throughout peak pricing period to minimise electricity purchasing costs of consumers . EV as V2H is studied in Alahyari et al to reduce peak time load demand and interruption costs during power outage. EV battery is discharged to the minimum state‐of‐charge (SOC), EV is placed at home throughout the day, ie, constant SOC in day time to provide similar cost saving purpose.…”
Section: Introductionmentioning
confidence: 99%
“…With the deployment of PHEVs in Smart grids, their effects on reliability cannot be neglected. Different studies on the optimal management of PHEVs are presented in [5][6][7]. The development of vehicle to grid technology caused that the PHEVs could be able to serve as energy storage resources and take part in ancillary services such as frequency regulation.…”
Section: Introductionmentioning
confidence: 99%