2019
DOI: 10.1016/j.orp.2019.100115
|View full text |Cite
|
Sign up to set email alerts
|

Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
12
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 14 publications
(12 citation statements)
references
References 20 publications
0
12
0
Order By: Relevance
“…3 to Fig. 5), the scrap, finished stock, and buyer stock levels in condition two of the proposed system is as follows (Chiu et al, 2019c):…”
Section: Condition 2: No Breakdown Happens During T1πmentioning
confidence: 99%
See 1 more Smart Citation
“…3 to Fig. 5), the scrap, finished stock, and buyer stock levels in condition two of the proposed system is as follows (Chiu et al, 2019c):…”
Section: Condition 2: No Breakdown Happens During T1πmentioning
confidence: 99%
“…(9) to (11) and total holding stocks in cycle time T'π can be computed by the use of Eq. (12)(Chiu et al, 2019c).…”
mentioning
confidence: 99%
“…12. Total inventories during the product distribution time t' 3π (Chiu et al, 2019b) is exhibited in Eq. (13).…”
Section: The Proposed Modelmentioning
confidence: 99%
“…Total inventories at the buyer side during the cycle length T' π can be calculated (Chiu et al, 2019b) as shown in Eq. 14.…”
Section: The Status Of Buyer's Stocks In Casementioning
confidence: 99%
See 1 more Smart Citation