“…The total amount of dose level was estimated at 0.028 dpa for the inbeam specimen under a constant displacement damage rate of 1.3 × 10 −7 dpa/s. Details of the welding conditions, specimen preparation, in-beam stress corrosion apparatus, and ir- 13,14) . The in-beam corroded specimen was chemically cleansed by hydrochloric acid solution (35%, 200 ml) with pure water (200 ml) and hexamethylenetetramine (1.4 g) for 600 s at room temperature, and then mechanically polished by a choroidal silica suspension (powder diameter of 0.06 μm) for about 1800 s to a mirror nish for EBSD measurements.…”