Improving the Voltage Quality and Power Transfer Capability of Transmission System Using FACTS Controller

Abstract: One of the main challenges of the future in the utility sector is constructing the new transmission line corridor. This is due to the fact that land compensation cost associated with the expansion of a new transmission line corridor becomes very expensive and also power transmission efficency is very low. In addition to that, the high carbon emission, which is the major challenge of the world right now, related to the additional conventional energy-based power generation to meet dramatically increased electric… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
1

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 8 publications
0
5
0
1
Order By: Relevance
“…Kinerja UPFC berdasarkan penelitian [11] [12] ideal dalam mengendalikan aliran daya dan tegangan bus. Pada penelitian [13] [14] [15] diketahui STATCOM efisien untuk peningkatan profil tegangan jaringan transmisi. Ketika kapasitor seri diaplikasikan di sistem tenaga, kapasitas transfer daya meningkat 37 kali begitu juga stabilitas tegangan [16].…”
Section: Pendahuluanunclassified
“…Kinerja UPFC berdasarkan penelitian [11] [12] ideal dalam mengendalikan aliran daya dan tegangan bus. Pada penelitian [13] [14] [15] diketahui STATCOM efisien untuk peningkatan profil tegangan jaringan transmisi. Ketika kapasitor seri diaplikasikan di sistem tenaga, kapasitas transfer daya meningkat 37 kali begitu juga stabilitas tegangan [16].…”
Section: Pendahuluanunclassified
“…After completing the processing of the original power data set, the graph consistency line variation relationship analysis model can be constructed, for which three parameters are selected and the optimal parameter values are set, which are the dimensionality reduction, the similarity matrix function and the number of clusters of proximity relationship, the specific parameter meanings and the corresponding optimal parameters are shown in Table 1 [4][5][6][7]. Considering that the operating loads of the line areas differ at different analysis window scales, in order to keep such differences to a minimum, this paper chooses day as the minimum time unit, and establishes the line variation topology on this basis to construct a graphical consistency line variation relationship model [8].…”
Section: Model Construction For Analysis Of Line Variation Relationsh...mentioning
confidence: 99%
“…In the calculation of each line, it is necessary to subtract the capacity occupation of the sending end grids and receiving end grids of previous sections. For the "Z" mode, the transmission capacity can be calculated by (11):…”
Section: Transmission Capacity Calculationmentioning
confidence: 99%
“…P max = P max11 + P max21 + P max22 P max11 = min(P sen1 , P rec1 , P l 11 ) P max21 = min(P sen2 , P rec1 − P max11 , P l 21 ) P max22 = min(P sen2 − P max21 , P rec2 , P l 22 ) (11) The footmark represents the number of the grid and line. Similarly, for "X" mode, the transmission capacity can be calculated by (12):…”
Section: Transmission Capacity Calculationmentioning
confidence: 99%
See 1 more Smart Citation