2019
DOI: 10.1016/j.energy.2019.05.079
|View full text |Cite
|
Sign up to set email alerts
|

Improving the availability and lengthening the life of power unit elements through the use of risk-based maintenance planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(2 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…Several previous studies have presented risk-based maintenance (RBM) methods [15][16][17][18][19][20][21][22][23][24][25][26], and they have not considered the risk consequences such as human health loss, asset loss, production loss, and maintenance costs. Some studies have suggested risk-based shutdown interval models, such as those proposed by Khan and Hameed [27] and Hameed et al [28].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Several previous studies have presented risk-based maintenance (RBM) methods [15][16][17][18][19][20][21][22][23][24][25][26], and they have not considered the risk consequences such as human health loss, asset loss, production loss, and maintenance costs. Some studies have suggested risk-based shutdown interval models, such as those proposed by Khan and Hameed [27] and Hameed et al [28].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Hence, for preserving social and economic issues related to human health and climate change sustainable operation of ash handling plant is of supreme importance in thermal power Industry. For the multipart repairable system, like, ash handling plant, failure prediction is a hard‐hitting assignment for the maintenance personnel, which leads to partial or complete failure in the plant operation, like, thermal power plant 4–6 and paper mill industry 7 . These minor or sudden failures can be overcome by planning and employing a scheduled preventive maintenance procedure for which failure behavior study of the plant is a must.…”
Section: Introductionmentioning
confidence: 99%