Proceedings of the Fifteenth European Conference on Computer Systems 2020
DOI: 10.1145/3342195.3387551
|View full text |Cite
|
Sign up to set email alerts
|

Improving resource utilization by timely fine-grained scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(3 citation statements)
references
References 28 publications
0
3
0
Order By: Relevance
“…A single scheduler is adopted in Borg [8] to improve the resource utilization with the consideration of machine sharing and performance isolation. Jin et al [20] proposed a task execution framework called Ursa, in which a centralized task scheduler was adopted to assign tasks globally. Although better deployment quality can be obtained, the deployment latency may increase since information about all tasks and hosts needs to be collected, especially when the number of tasks is very large.…”
Section: Scheduler Structuresmentioning
confidence: 99%
“…A single scheduler is adopted in Borg [8] to improve the resource utilization with the consideration of machine sharing and performance isolation. Jin et al [20] proposed a task execution framework called Ursa, in which a centralized task scheduler was adopted to assign tasks globally. Although better deployment quality can be obtained, the deployment latency may increase since information about all tasks and hosts needs to be collected, especially when the number of tasks is very large.…”
Section: Scheduler Structuresmentioning
confidence: 99%
“…Resource over-commitment and virtual machine consolidation in cloud. Overcommitment [10,21] in which the sum of allocated resources to multiple containers is larger than physical capacity, is proposed to increase the resource utilization in recent cloud architecture like Borg [24]. With proper consolidation of multiple containers [23], statistical multiplexing to over-commit resources can avoid almost all resource violations.…”
Section: Related Workmentioning
confidence: 99%
“…The most important task is to meet the clients' expectations through the guarantee of meeting the deadline of the production orders' realization with the simultaneous profit maximization gained through selling the productions orders received for realization (Jardzioch & Skobiej, 2013;Lee & Kim, 2001). The simultaneous goal of scheduling is maximization of utilization the machines, which is more widely described in the manuscripts (Jin et al, 2020;Wang et al, 2020), where the authors discuss the topic of improving resource utilization by timely finegrained scheduling and detailed planning, as well as the problem of multi-objective production scheduling for balanced production of manufactures. The issue of scheduling the production tasks is a significantly complex area analyzed in many research centers.…”
Section: Introductionmentioning
confidence: 99%