2018
DOI: 10.1016/j.promfg.2018.10.115
|View full text |Cite
|
Sign up to set email alerts
|

Improving manual assembly lines devoted to complex electronic devices by applying Lean tools

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
13
0
4

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 44 publications
(19 citation statements)
references
References 20 publications
0
13
0
4
Order By: Relevance
“…Nabi et al 4 on the other hand undertook a time study to determine the standard minute value (SMV), which was subsequently used to eliminate bottlenecks, reduce idle time, and improve efficiency. At present, line balancing techniques have received much attention than other line efficiency and process improvement techniques 23 such as lean manufacturing (VSM), [32][33][34][35] Lean-six sigma, 36,37 Six sigma, 38 and hybrid approach (lean manufacturing and line balancing). 39 Line balancing techniques involve several constraints that have to be put into consideration for example task assignment, task precedence, cycle time, and resource constraints.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Nabi et al 4 on the other hand undertook a time study to determine the standard minute value (SMV), which was subsequently used to eliminate bottlenecks, reduce idle time, and improve efficiency. At present, line balancing techniques have received much attention than other line efficiency and process improvement techniques 23 such as lean manufacturing (VSM), [32][33][34][35] Lean-six sigma, 36,37 Six sigma, 38 and hybrid approach (lean manufacturing and line balancing). 39 Line balancing techniques involve several constraints that have to be put into consideration for example task assignment, task precedence, cycle time, and resource constraints.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Integrated with the internal communication project, the intention is for the entire company to be provided with daily data for decision making. This communication is performed transversally and vertically, based on the LL project, in which communication constitutes one of the pillars for the development of employees [19][20][21] at a time when customers are increasingly more demanding [22][23][24].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Destacado como uma das práticas mais frequentes na gestão da produção e como apoio à melhoria contínua [14], o trabalho padronizado é útil para redução da variabilidade nos sistemas produtivos [15]. Esta abordagem é utilizada visando a melhoria em processos de remanufatura [16], em linha de montagem manual na indústria eletrônica [17], em linha de montagem da indústria automotiva [18] e de tratores [19], entre outros.…”
Section: Referencial Teóricounclassified