IOR 1997 - 9th European Symposium on Improved Oil Recovery 1997
DOI: 10.3997/2214-4609.201406760
|View full text |Cite
|
Sign up to set email alerts
|

Improving Hydrocarbon Recovery Efficiency Utilising Horizontal Production and/or Injection Wells

Abstract: Horizontal wens have seen a dramatic rise in the range of applications and the number of wens completed during the past decade . However, horizontal wens have been primarily drieled as producers maximising tee benefit from the large reservo ir contact which such boreho les allow. To date there have been only a handful of repo rted applications of horizontal wens as injectors . The potential benefit of horizontal injectors could lie in improving the sweep efficiency and enhancing the degree of pressure maintena… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2004
2004
2004
2004

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The use of horizontal wells for productivity enhancement is well known and while still somewhat rare, horizontal injection wells have been proposed and implemented in a wide variety of applications (3)(4)(5)(6)(7) . As part of an on-going effort to improve injection capacity of the disposal wells, fi eld trials involving four horizontal water disposal wells and four propped hydraulic fracture vertical disposal wells were conducted.…”
Section: Alternate Drilling and Stimulation Optionsmentioning
confidence: 99%
“…The use of horizontal wells for productivity enhancement is well known and while still somewhat rare, horizontal injection wells have been proposed and implemented in a wide variety of applications (3)(4)(5)(6)(7) . As part of an on-going effort to improve injection capacity of the disposal wells, fi eld trials involving four horizontal water disposal wells and four propped hydraulic fracture vertical disposal wells were conducted.…”
Section: Alternate Drilling and Stimulation Optionsmentioning
confidence: 99%