2012
DOI: 10.1080/00207543.2011.624563
|View full text |Cite
|
Sign up to set email alerts
|

Improved variable neighbourhood search for integrated tundish planning in primary steelmaking processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(3 citation statements)
references
References 24 publications
0
3
0
Order By: Relevance
“…Various integrated planning methods have been reported in the literature for steelmaking, continuous casting or hot rolling process separately [2][3][4][5][6][7]. However, researches on integrated planning for the SM-CC-HR integrated production process are relatively few.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Various integrated planning methods have been reported in the literature for steelmaking, continuous casting or hot rolling process separately [2][3][4][5][6][7]. However, researches on integrated planning for the SM-CC-HR integrated production process are relatively few.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Equation (7) is used to calculate the particle's new velocity according to its previous velocity and the distances of its current position from its own best experience (position) and the group's best experience. Then, the particle flies toward a new position according to Equation (8). The performance of each particle is measured according to a predefined fitness function, which is related to the problem to be solved.…”
Section: Particle Swarm Optimizationmentioning
confidence: 99%
“…Based on the research of Dong et al. [6,8], the problem in the first level can be solved. Here, the CAST_LOT (charges with the same steel grades can be classified into one CAST_LOT) sort should be done based on the rule and tundish planning.…”
Section: Description Of the Bmsccfj Processesmentioning
confidence: 99%