SPE/IADC Drilling Conference and Exhibition 2017
DOI: 10.2118/184653-ms
|View full text |Cite
|
Sign up to set email alerts
|

Improved Through-Christmas-Tree P&A Plug Placement with New Innovative Cementing Methodology

Abstract: When the production of a platform well is no longer profitable, two options are available—either perform permanent plug and abandonment (P&A) or reuse the slot by plugging the original well and sidetracking. P&A requires setting barrier elements in the wellbore to prevent hydrocarbon migration between potential flow zones and to the surface. In most cases, it is financially beneficial to perform as much of this work as possible during an intervention phase before rig operations begin, thus saving rig o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance