2014
DOI: 10.1002/qre.1623
|View full text |Cite
|
Sign up to set email alerts
|

Improved Phase I Control Charts for Monitoring Times Between Events

Abstract: In many situations the times between certain events are observed and monitored instead of the number of events themselves, particularly when the events occur rarely. In this case it is common to assume that the times between events follow an exponential distribution. Control charts are one of the main tools of statistical process control and monitoring. Control charts are used in Phase I to assist operating personnel in bringing the process into a state of statistical control. In this paper, Phase I control ch… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
40
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 18 publications
(41 citation statements)
references
References 15 publications
(44 reference statements)
1
40
0
Order By: Relevance
“…and Eq. (11) for a and b , and c and d , respectively, but this becomes complicated quickly because m can be very large in Phase‐I application as discussed by Human et al . Therefore, we use an alternative approach to find the values of these constants.…”
Section: Statistical Calculations and Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…and Eq. (11) for a and b , and c and d , respectively, but this becomes complicated quickly because m can be very large in Phase‐I application as discussed by Human et al . Therefore, we use an alternative approach to find the values of these constants.…”
Section: Statistical Calculations and Resultsmentioning
confidence: 99%
“…To this end, the FAP for Phase‐I | S | chart (see, Human et al FAP0.25em=Pr()Umax.2em.2embtrue|IC+Pr()Umin.2em.2ematrue|ICPr()Umax.2em.2emb0.25emand0.25emUmin.2em.2ema0.25emtrue|IC where U max and U min denote the maximum and the minimum order statistic of U i , i = 1, 2, …, m .…”
Section: Statistical Calculations and Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…Other developments on TBE charts include the economic design of the charts, the Phase I TBE charts, the bivariate TBE chart, the runs rules based TBE charts, and the TBE chart for sampling inspection …”
Section: Introductionmentioning
confidence: 99%