2017
DOI: 10.3390/jmse5020020
|View full text |Cite
|
Sign up to set email alerts
|

Improved Methodology of Weather Window Prediction for Offshore Operations Based on Probabilities of Operation Failure

Abstract: Abstract:The offshore wind industry is building and planning new wind farms further offshore due to increasing demand on sustainable energy production and already occupied prime resource locations closer to shore. Costs of operation and maintenance, transport and installation of offshore wind turbines already contribute significantly to the cost of produced electricity and will continue to increase, due to moving further offshore, if the current techniques of predicting offshore wind farm accessibility are to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
19
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 27 publications
(19 citation statements)
references
References 25 publications
0
19
0
Order By: Relevance
“…He classifies the spare parts inventory management and the maintenance support organization (vessels, cranes, helicopters, personnel) as a tactical issue in offshore wind farm maintenance logistics. Gintautas and Sørensen [24] present constraints for both installation and O&M vessels given in the previous literature by Dinwoodie et al [44], Besnard et al [13], Nielsen and Sørensen [10], O'Connor et al [45], Van Bussel and Bierbooms [46], O'Connor et al [47], McMillan and Ault [48], Wu [49] and Ahn et al [50]. Raknes et al [25] consider two different vessel types-an accommodation vessel and a crew transfer vessel, in their analysis.…”
Section: Vessel Personnel and Spare Part Logisticsmentioning
confidence: 99%
“…He classifies the spare parts inventory management and the maintenance support organization (vessels, cranes, helicopters, personnel) as a tactical issue in offshore wind farm maintenance logistics. Gintautas and Sørensen [24] present constraints for both installation and O&M vessels given in the previous literature by Dinwoodie et al [44], Besnard et al [13], Nielsen and Sørensen [10], O'Connor et al [45], Van Bussel and Bierbooms [46], O'Connor et al [47], McMillan and Ault [48], Wu [49] and Ahn et al [50]. Raknes et al [25] consider two different vessel types-an accommodation vessel and a crew transfer vessel, in their analysis.…”
Section: Vessel Personnel and Spare Part Logisticsmentioning
confidence: 99%
“…An example of guidance for establishing weather operability criteria was proposed by DNV-GL in [48]. This guidance is a common standard within the marine industry and is used as a base for comparison of advanced techniques [49,50]. As described in the guidance, establishing the weather operability for an equipment or an operation includes the knowledge of the sequence of operations, failure mode and contingency scenarios [48] (Section 4 therein).…”
Section: Assets Availability Factormentioning
confidence: 99%
“…Additionally, different policies can only be evaluated manually, by implementing each strategy individually in the model. Some exceptions to the dependency on Monte Carlo simulations are some newer approaches, using stochastic models [3] or genetic algorithms [4]. The influence of uncertainties on the optimal scheduling of corrective maintenance has been investigated for the repair time [5], and the weather forecast [3,6].…”
Section: Introductionmentioning
confidence: 99%