2014 IEEE PES T&D Conference and Exposition 2014
DOI: 10.1109/tdc.2014.6863322
|View full text |Cite
|
Sign up to set email alerts
|

Implementing distance line protection schemes among IEC61850-enabled substations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…Hence, the time delay for zone 2 faults has to be reduced. One of the solution is to provide communication-assisted accelerated distance protection scheme in transmission line which can speed up the overall fault clearing time [11]. In distance protection scheme, this communication-assisted accelerated protection scheme requires signalling of ON/OFF signals and is realised using tele-protection [8].…”
Section: Introductionmentioning
confidence: 99%
“…Hence, the time delay for zone 2 faults has to be reduced. One of the solution is to provide communication-assisted accelerated distance protection scheme in transmission line which can speed up the overall fault clearing time [11]. In distance protection scheme, this communication-assisted accelerated protection scheme requires signalling of ON/OFF signals and is realised using tele-protection [8].…”
Section: Introductionmentioning
confidence: 99%