1999
DOI: 10.3141/1666-01
|View full text |Cite
|
Sign up to set email alerts
|

Implementation of a Timed Transfer Network at Norfolk, Virginia

Abstract: The principles and practices of designing and implementing a multicenter-based timed transfer network at a medium-sized transit agency are discussed. Information is presented on route structure concepts, network design tools and considerations, the effect of the service structure on passenger transfers, and rider behavior. Notable differences from existing practices and assumptions are emphasized, especially relative to the commonly used central business district–focused radial network. Both operational and cu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(10 citation statements)
references
References 0 publications
0
10
0
Order By: Relevance
“…For example, integration techniques such as integrated timed-transfers require operators to synchronise their timetable. Successful implementation is dependent on schedule reliability and therefore the overall reliability of the network improves (Becker and Spielberg, 1999). Chowdhury and Ceder (2013b) discussed that route integration may require PT users to make transfers to reach their final destination, but by providing routes that are reliable and well-connected, the total travel time of the journey can be reduced.…”
Section: Travel Timementioning
confidence: 98%
“…For example, integration techniques such as integrated timed-transfers require operators to synchronise their timetable. Successful implementation is dependent on schedule reliability and therefore the overall reliability of the network improves (Becker and Spielberg, 1999). Chowdhury and Ceder (2013b) discussed that route integration may require PT users to make transfers to reach their final destination, but by providing routes that are reliable and well-connected, the total travel time of the journey can be reduced.…”
Section: Travel Timementioning
confidence: 98%
“…The stress due to waiting times is associated with delay in arrival times and incurring additional time for making transfers (Wardman, 2004). Integrated PT systems aim to increase reliability of transfer waiting times by implementing timed-transfers (Becker and Spielberg, 1999). Information and personal safety, followed by weather protection are the three factors which influences the perception of waiting times.…”
Section: Waiting Timementioning
confidence: 99%
“…This is achieved by operators synchronizing their scheduled routes to develop a pulsedhub network (Becker and Spielberg 1999). Since the performance of timed-transfer is dependent on schedule reliability, implementation improves the overall reliabil ity of the transport system (Maxwell 2003).…”
Section: Integrated Timed-transfermentioning
confidence: 99%
“…Since the performance of timed-transfer is dependent on schedule reliability, implementation improves the overall reliabil ity of the transport system (Maxwell 2003). Routes and scheduling are required to be designed simultaneously (Becker and Spielberg 1999).…”
Section: Integrated Timed-transfermentioning
confidence: 99%