2019
DOI: 10.7492/ijaec.2019.010
|View full text |Cite
|
Sign up to set email alerts
|

Impact of Procurement Methods on Material Waste in Low-Rise Building Projects in Nigeria

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…By improving the quality of supervision on site with capable supervisors, the rate of material waste on site can be reduced [16]. Apart from that, the consultant's perception seems to indicate that their absence and roles on site are more significant in minimising material waste [1]. Poor management indicates in the prospect of upper-level management of the company's carelessness, especially by managers and site supervisors [3].…”
Section: Lack Of Supervisionmentioning
confidence: 99%
“…By improving the quality of supervision on site with capable supervisors, the rate of material waste on site can be reduced [16]. Apart from that, the consultant's perception seems to indicate that their absence and roles on site are more significant in minimising material waste [1]. Poor management indicates in the prospect of upper-level management of the company's carelessness, especially by managers and site supervisors [3].…”
Section: Lack Of Supervisionmentioning
confidence: 99%
“…The construction industry is a major source of building infrastructure to support city growth and contributes to environmental degradation. Adewuyi and Odesola (2015) defined construction waste as 'construction materials that are lost in transit on or off site, discarded without adding value to the project for which it was procured including overproduction or left over from newly constructed facility'. According to Ikau et al (2016), inexperience in construction waste, nonconformance of materials with requirements, poor storage, and rework are the primary sources of material waste in construction projects.…”
Section: Introductionmentioning
confidence: 99%