2013
DOI: 10.1016/j.procir.2013.06.032
|View full text |Cite
|
Sign up to set email alerts
|

Impact of Machine Reliability Data Uncertainty on the Design and Operation of Manufacturing Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
4
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…The investigation of the dependence between the product design and the commissioning phase has been identified as a valuable path of research (Colledani et al, 2018 Terwiesch and Bohn, 2001), but detailed investigations into that relation are scarce. Colledani and Yemane (2013) focus on the improvement of decisions made in the design of multistage manufacturing systems. Although the purpose of the study is to overcome data uncertainty, the proposed approach is heavily data-driven and therefore unfit to be applied in an environment characterized by a challenging information management such as ETO businesses.…”
Section: Relation Between Commissioning and Product Developmentmentioning
confidence: 99%
“…The investigation of the dependence between the product design and the commissioning phase has been identified as a valuable path of research (Colledani et al, 2018 Terwiesch and Bohn, 2001), but detailed investigations into that relation are scarce. Colledani and Yemane (2013) focus on the improvement of decisions made in the design of multistage manufacturing systems. Although the purpose of the study is to overcome data uncertainty, the proposed approach is heavily data-driven and therefore unfit to be applied in an environment characterized by a challenging information management such as ETO businesses.…”
Section: Relation Between Commissioning and Product Developmentmentioning
confidence: 99%
“…This research area provides integrated analytic models, implemented within digital tools, for the analysis of the effective throughput in multi-stage systems, directly considering the interaction between quality, logistics and maintenance aspects. Among these, in [28] the authors developed a model of a multi-stage asynchronous serial line where machines are subject to failures and degradation. In operational states, the production of defective items is considered.…”
Section: Ramp-up Considerations During Product and System Designmentioning
confidence: 99%
“…However, these data are usually emerging from the system behavior once the system is installed. In [28], the effect of uncertain reliability parameters estimates on the subsequent system design decisions is investigated. The authors show that, in order to cope with this uncertain information, a robust system design should be performed, resulting in a more-expensive over-capacitated configuration that can better cope with the ramp-up phase.…”
Section: Ramp-up Considerations During Product and System Designmentioning
confidence: 99%
“…CavY QO |vt}= w CW=Oy@ C} Q}Ot sDU}U l} |L=Q] hOy =@ 7 pQtwm "OvOQm [10] "O=O x=Q= |}=}=B |R=Uxv}y@ Q@ |vD@t |rOt uOat =@ = Q Cq}yUD u=tO}J w |Q=m |=[i C=t= Rr= s}y=it 8 u= Q=mty w uwOwU=w QO [11] "OvOQm |UQQ@ |@}mQD Qw] x@ Oqwi |xv=NQ=m l} |QwxQy@ w |}=}=B s}y=it pwtat OQm}wQ hqN Q@ u=oOvU}wv '|}=Pe O=wt O}rwD \N |xQ=@QO |Qo}O j}kLD |=yxikw uOQm xv}tm |= Q@ 9 x=owro R= ?=vDH= T=U= Q@ |Q=m |=yx=oDU}= |L=Q] u=oOvU}wv \UwD xm |QwQt =@ '`wtHt QO [3] "OvOQ@ xQy@ |}=}=B [19] [20]`H Qt QO p=Ft u=wva x@ "CU= xDiQo u}= [18]10 u= Q=mty w =}vw@ "CU= xOW |UQQ@ |O}rwD |=ysDU}U C=}rta w |L=Q] Q@ |=yC}OwOLt ZQi w |}xrY=i |=yxO=O =@ |R=wt -|QU sDU}U l} |= Q@ = Q xrUt 11 u= Q=mty w wy=W u}vJty "Ov=xOQm pL l}DvS sD} Qwor= =@ w xO=O xaUwD |iO=YD pmW x@ |R=wt -|QU sDU}U l} |= Q@ = Q |}=}=B |R=Uxv}y@ |xrUt [21]`H Qt QO l}DvS sD} Qwor= Q@ |vD@t |}xrLQt wO |WwQ =@ w |a]k |=yC}OwOLt =@ xiOyOvJ |R=Uxv}y@ p=Ut pL |= Q@ O} Q@D |R=Ux}@W sD} Qwor= [22]…”
mentioning
confidence: 99%