Impact of Energy Storage Costs on Economical Performance in a Distribution Substation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
63
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 151 publications
(64 citation statements)
references
References 11 publications
0
63
0
Order By: Relevance
“…To minimize the costs of the DN, the charge/discharge operation must be scheduled so as to store energy during periods of low energy prices (light-load periods) and discharge during the hours of the day in which the peak demand of the DN occurs [24]. For this purpose, the BESS model used in this work considers the stored energy as a state variable [24,27]. The energy level in the BESS is calculated as the difference between the stored energy of two consecutive stages [27]:…”
Section: Bess Schedulingmentioning
confidence: 99%
See 2 more Smart Citations
“…To minimize the costs of the DN, the charge/discharge operation must be scheduled so as to store energy during periods of low energy prices (light-load periods) and discharge during the hours of the day in which the peak demand of the DN occurs [24]. For this purpose, the BESS model used in this work considers the stored energy as a state variable [24,27]. The energy level in the BESS is calculated as the difference between the stored energy of two consecutive stages [27]:…”
Section: Bess Schedulingmentioning
confidence: 99%
“…The energy costs are expressed in cost per unit of stored energy ($/kWh), while the power costs in cost per unit of power ($/kW). Consequently the BESS capital costs can be expressed as [24,30]:…”
Section: Economic Evaluationmentioning
confidence: 99%
See 1 more Smart Citation
“…'The major impact and costs originating from the production and consumption of energy related activities such as fuel cycles', [8]. These costs arise when an activity with a specified price has an impact on another activity, and imposes on the latter an additional cost that was not accounted for in the former price.…”
Section: World Energy Demands and Energy Sourcesmentioning
confidence: 99%
“…To find the maximal NPV a matrix real coded genetic algorithm is used. A Genetic Algorithm (GA) [5] based on multiple objective functions. To evaluate the economic impact of energy storage specific cost on net present value of energy storage installations in distribution substations.…”
mentioning
confidence: 99%