2012
DOI: 10.4028/scientific5/amr.446-449.2118
|View full text |Cite
|
Sign up to set email alerts
|

Impact of Broken Rock behind Expressway Tunnel Lining on Structure Safety

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…It will result in lining crack, water leakage, loss or even collapse, and the operation safety of tunnel will be threatened. As the cavity of secondary lining changes the stress state of structure, and increases the possibility of structural damage, the lining usually cannot continue operation, and safety and durability of tunnel lining will be affected [2,3]. The cavity of secondary lining must be detected, and its location and scale must be found.…”
Section: Introductionmentioning
confidence: 99%
“…It will result in lining crack, water leakage, loss or even collapse, and the operation safety of tunnel will be threatened. As the cavity of secondary lining changes the stress state of structure, and increases the possibility of structural damage, the lining usually cannot continue operation, and safety and durability of tunnel lining will be affected [2,3]. The cavity of secondary lining must be detected, and its location and scale must be found.…”
Section: Introductionmentioning
confidence: 99%
“…The existing tunnels in service have suffer various damage by the action of geological conditions, terrain condition, climate condition and design, construction, operation factors. The cavity behind lining is a factor cannot be ignored, it may result in lining verge occurs crack, crack, unstable, drop and even suddenly collapse [1]. If the cavities and the conditions in the initial stage of tunnel defect appearing or developing can be accurately determined, it would be extremely advantage to early diagnose and effectively maintain of the tunnel defect.…”
Section: Introductionmentioning
confidence: 99%