2018
DOI: 10.1016/j.autcon.2018.02.016
|View full text |Cite
|
Sign up to set email alerts
|

Image-based semantic construction reconstruction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 18 publications
(19 citation statements)
references
References 27 publications
0
17
0
Order By: Relevance
“…From the programmer's point of view, it is to study the method of automating this process. In the computer field, the current research mainly focuses on semantic description, semantic classification methods, semantic knowledge base, semantic map, semantic layer interpretation strategy and the construction of knowledge semantic model under the Semantic Web (Collarana et al, 2017;Liu et al, 2018;S. Wang et al, 2018).…”
Section: Semantics Concept and Constructionmentioning
confidence: 99%
“…From the programmer's point of view, it is to study the method of automating this process. In the computer field, the current research mainly focuses on semantic description, semantic classification methods, semantic knowledge base, semantic map, semantic layer interpretation strategy and the construction of knowledge semantic model under the Semantic Web (Collarana et al, 2017;Liu et al, 2018;S. Wang et al, 2018).…”
Section: Semantics Concept and Constructionmentioning
confidence: 99%
“…Kim et al (2017) developed an AR system to provide workers safety information to avoid hazards. Liu et al, 2018 deployed AR technologies to give the workers alarms of dangers from falling. The authors are committed to the implementation of AR to increase the safety of workers.…”
Section: Site Safetymentioning
confidence: 99%
“…Akhavian and Behzadan (2012) developed a framework driven by data to collect real-time field data and visualize dynamic 3D simulations of engineering activities. Liu et al (2018) developed a rapid construction site information acquisition method to conduct dynamic site layout planning. Besides overcoming technical difficulties, performance-based FIGURE 6 | Connecting AR devices with sensors (Aguero et al, 2020).…”
Section: Site Safetymentioning
confidence: 99%
“…The problem of deviations from the original constructions of buildings, which are not well documented, is solved for reconstruction or demolition by a newly developed model, which is presented by Volk et al [41]. Researchers are also trying to create virtual reality tools for planning work, which can, according to Liu et al [42], significantly increase the quality and reduce the prices of reconstruction or construction works. One example is a three-dimensional terrain reconstruction system using stereo cameras [43]; or a three-dimensional reconstruction of the roofs of buildings in larger units, as introduced by Awrangjeb, Gilani, and Siddiquim [44].…”
Section: Literary Researchmentioning
confidence: 99%