2021
DOI: 10.3390/app11167270
|View full text |Cite
|
Sign up to set email alerts
|

IFC-Based 4D Construction Management Information Model of Prefabricated Buildings and Its Application in Graph Database

Abstract: Effective data interoperability and schedule analysis play a significant role in improving the management of prefabricated buildings. However, there is a lack of efficient strategies and comprehensive approaches for data interoperability and data-based automated schedule analysis. This paper intends to promote prefabricated buildings’ management by solving these two problems via developing an IFC-based framework consisting of three parts. Firstly, this framework proposed a mechanism to establish an IFC-based 4… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 15 publications
(11 citation statements)
references
References 48 publications
0
8
0
1
Order By: Relevance
“…Somit lassen sich stark verknüpfte Datensätze effizient abspeichern und abfragen. Darüber hinaus erlauben Graphdatenbanken die flexible Anpassung des zugrunde liegenden Schemas [12]. Zwar können Graphdatenbanken auch ohne Schema verwendet werden, jedoch sehen die Autoren große Vorteile in der zielgerichteten Abfrage von klar strukturierten Graphen [13, 14].…”
Section: Erfahrungsbericht Baustellenüberwachungunclassified
“…Somit lassen sich stark verknüpfte Datensätze effizient abspeichern und abfragen. Darüber hinaus erlauben Graphdatenbanken die flexible Anpassung des zugrunde liegenden Schemas [12]. Zwar können Graphdatenbanken auch ohne Schema verwendet werden, jedoch sehen die Autoren große Vorteile in der zielgerichteten Abfrage von klar strukturierten Graphen [13, 14].…”
Section: Erfahrungsbericht Baustellenüberwachungunclassified
“…This model works well for property-graph-based huge datasets in relationship traversal. It has been used for the 4D construction management information model of prefabricated buildings [81] and the development of a BIM-enabled software tool for facility management [82].…”
Section: • Graphmentioning
confidence: 99%
“…Thus, the IFC standard should be extended to meet specific project targets to ensure that the required engineering information is captured adequately and completely from certain system applications [16,17]. Based on the engineering characteristics of certain projects, efforts of IFC extension have been implemented in various fields (e.g., bridge [13,18], tunnel [19,20]), mainly focusing on construction management [21,22], cost estimation [23,24], seismic components [25], and design change management [26].…”
Section: Application Of Ifc To the Aec Industry With Extensionmentioning
confidence: 99%