2020
DOI: 10.1108/jopp-11-2019-0075
|View full text |Cite
|
Sign up to set email alerts
|

Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry

Abstract: Purpose The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry. Design/methodology/approach From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
21
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7
1
1

Relationship

2
7

Authors

Journals

citations
Cited by 27 publications
(25 citation statements)
references
References 42 publications
1
21
0
Order By: Relevance
“…In this study, a structured survey questionnaire was self-administered (through a combination of an online survey and the drop-and-pick method) to achieve a 77% response rate. This is consistent with Dillman et al (2014), Owusu-Manu et al (2019) and Kissi et al (2020) who adopted this approach and achieved a response rate of 57% and 75%, respectively.…”
Section: Methodssupporting
confidence: 91%
“…In this study, a structured survey questionnaire was self-administered (through a combination of an online survey and the drop-and-pick method) to achieve a 77% response rate. This is consistent with Dillman et al (2014), Owusu-Manu et al (2019) and Kissi et al (2020) who adopted this approach and achieved a response rate of 57% and 75%, respectively.…”
Section: Methodssupporting
confidence: 91%
“…Others have cemented on procurement planning as a strategic function which was considered to be important for ensuring procurement performance (Mesa et al , 2017; Panga et al , 2015; Salim and Kitheka, 2019). Also, the procurement planning was found to be significantly associated with value for money in procurement (Changalima, 2016) which is important in the public sector that uses the taxpayers’ monies (Kissi et al , 2020).…”
Section: Findings and Discussionmentioning
confidence: 99%
“…It can, be deduced that construction professionals understand and give more importance to the obtained variables. Furthermore, the standard deviation in each of the three main constructs recorded values less than 1, indicating a high level of uniformity among the respondents and little variability in the data set (Field, 2005, Kissi et al ., 2020).…”
Section: Methodsmentioning
confidence: 99%
“…Numerous researchers claim that the construction industry suffers from poor performance (Kissi et al , 2020; Owusu-Manu et al , 2019). Highly competitive and reflective alterations in the construction industry have compelled construction executives to incessantly augment the performance of their firms.…”
Section: Introductionmentioning
confidence: 99%