1989
DOI: 10.1016/0360-8352(89)90161-7
|View full text |Cite
|
Sign up to set email alerts
|

Identifying multiple solutions for assembly line balancing having stochastic task times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

1992
1992
2019
2019

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 17 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…There is an overwhelming number of research works that cover the balancing of manual assembly lines [20]. Nearly all their methodologies consider a single-model line with various objective functions such as (i) maximization of profit [21], or minimization of (ii) the number of stations for a given cycle time [22], [23]; (iii) the cycle time for a given number of stations [24]; or (iv) expected total costs [25], [26].…”
Section: B Optimization In a Mixed Model Assembly Linementioning
confidence: 99%
“…There is an overwhelming number of research works that cover the balancing of manual assembly lines [20]. Nearly all their methodologies consider a single-model line with various objective functions such as (i) maximization of profit [21], or minimization of (ii) the number of stations for a given cycle time [22], [23]; (iii) the cycle time for a given number of stations [24]; or (iv) expected total costs [25], [26].…”
Section: B Optimization In a Mixed Model Assembly Linementioning
confidence: 99%
“…To deal with this uncertainty, the following models were proposed in the literature. Task times were assumed to be random variables with either known continuous probability distributions (Zhao, Liu, Ohno, & Kotani, 2007), or known or unknown symmetric probability distributions (Betts & Mahmoud, 1989;Raouf & Tsui, 1982), or known independent normal probability distributions. This third case has received quite some attention: earlier papers have focused on optimizing straight assembly lines where heuristic (Carter & Silverman, 1984;Chakravarty & Shtub, 1986;Fazlollahtabar, Hajmohammadi, & Es'haghzadeh, 2011;Kao, 1979;Lyu, 1997;Shin, 1990;Silverman & Carter, 1986), metaheuristic (Cakir, Altiparmak, & Dengiz, 2011;Erel, Sabuncuoglu, & Sekerci, 2005) and exact solution methods (Henig, 1986;Kao, 1976;Sarin, Erel, & Dar-el, 1999) were proposed.…”
Section: Assembly Line Design and Balancingmentioning
confidence: 99%