Identifying key risks in infrastructure projects – Case study of Cairo Festival City project in Egypt

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
20
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 34 publications
(26 citation statements)
references
References 10 publications
1
20
0
Order By: Relevance
“…[53] Technology changes (R63) Technology (e.g., process flow and design drawings) incurs significant changes in the PP. [54,55] Lack of sharing technology among projects (R64)…”
Section: Weak Technology Maturity (R61)mentioning
confidence: 99%
“…[53] Technology changes (R63) Technology (e.g., process flow and design drawings) incurs significant changes in the PP. [54,55] Lack of sharing technology among projects (R64)…”
Section: Weak Technology Maturity (R61)mentioning
confidence: 99%
“…is section introduces project complexity and its consequences and then Project Risk Management processes and heuristics-based [28,29], and analytical methods [30][31][32][33][34][35].…”
Section: Research Questionmentioning
confidence: 99%
“…Over the time, Construction industry has become more complex. The identification of project objectives itself turns to vagueness in many projects [14], [15]. Additionally, construction projects started to include several parties with different levels of expectation and experience [16].…”
Section: Risk Management In Construction Projectsmentioning
confidence: 99%
“…Respondent experience in terms of years, which is divided into four groups; (0-5),(5)(6)(7)(8)(9)(10),(10)(11)(12)(13)(14)(15)(16)(17)(18)(19)(20), and (More than 20) 2. Company characteristics, labelled to four categories (Engineering Consultant, Contractor, Developer, and Others).…”
mentioning
confidence: 99%