Identify, analyse and mitigate—Quantification of technical risks in PV power systems

Abstract: Technical risks are important criteria to consider when investing in new and existing PV installations. Quantitative knowledge of these risks is one of the key factors for the different stakeholders, such as asset managers, banks or project developers, to make reliable business decisions before and during the operation of their PV assets. Within the IEA PVPS Task 13 Expert Group, we aim to increase the knowledge on methodologies to assess technical risks and mitigation measures in terms of economic impact and … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 14 publications
(14 citation statements)
references
References 20 publications
0
8
0
Order By: Relevance
“…Also, constant high temperatures are detrimental to bypass diode and junction box function and can increase failure rates. [62] Then, investigating the climate change effects on failures would complete this study to more accurately assess PV performance in warmer weather conditions.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Also, constant high temperatures are detrimental to bypass diode and junction box function and can increase failure rates. [62] Then, investigating the climate change effects on failures would complete this study to more accurately assess PV performance in warmer weather conditions.…”
Section: Discussionmentioning
confidence: 99%
“…Also, constant high temperatures are detrimental to bypass diode and junction box function and can increase failure rates. [ 62 ]…”
Section: Discussionmentioning
confidence: 99%
“…When applying different scenarios, different detection and mitigation measures can be weighed against each other to evaluate the most cost effective solution. Recently, insightful studies have been conducted looking into inverter failure, PID and soiling mitigation strategies by Herz et al 22 and defective bypass diodes, PID and cell cracks detected by using electroluminescence imaging by Koester et al 24 Nevertheless, these studies are still based on a scenario‐based analysis.…”
Section: Cost Priority Number Methodologymentioning
confidence: 99%
“…Most of the investigated systems have been installed in the early 2010s, a probable reason as to why modern module issues such as light and elevated temperature-induced degradation (LeTID) are not reported. Nevertheless, based on statistics regarding the appearance of degradation from literature, 15,19,22,23 it can be assumed that far more performance while others are more prone to issues, which is ultimately also reflected in the tickets. This can have various reasons, among others the complexity of the PV project, the quality of used components, terrain conditions, the O&M strategy itself, and the quality of the design and installation phase.…”
Section: Statistical Assessment Of Oandm Ticketsmentioning
confidence: 99%
See 1 more Smart Citation