2018
DOI: 10.1061/(asce)ae.1943-5568.0000313
|View full text |Cite
|
Sign up to set email alerts
|

Identification of Factors and Decision Analysis of the Level of Modularization in Building Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
26
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2

Relationship

2
6

Authors

Journals

citations
Cited by 75 publications
(34 citation statements)
references
References 50 publications
0
26
0
Order By: Relevance
“…Then, Sharafi et al, suggested a list of critical decision making criteria that can be used for feasibility studies to select construction methods, such as the modular construction and stick-built construction methods, and developed a decision support system to facilitate the decision making process. By using the process, an appropriate construction system and the level of modularity can be determined [38]. These studies proved the importance of decision making in the early design phase and provided considerations that should be included for efficient modular building design.…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 98%
See 2 more Smart Citations
“…Then, Sharafi et al, suggested a list of critical decision making criteria that can be used for feasibility studies to select construction methods, such as the modular construction and stick-built construction methods, and developed a decision support system to facilitate the decision making process. By using the process, an appropriate construction system and the level of modularity can be determined [38]. These studies proved the importance of decision making in the early design phase and provided considerations that should be included for efficient modular building design.…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 98%
“…In other words, if the design phase is not coordinated properly, modular construction can cost much more than stick-built construction [2,6,12,22,26,27]. In addition to the absence of an integrated process, there is currently limited expertise in modular construction in the marketplace; hence, the approach to design is still largely based on traditional methods [18,37,38]. This may lead to difficulty in identifying errors and omissions in the design, especially with complex information flows [15,17].…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 99%
See 1 more Smart Citation
“…Fully prefabricated cold-formed steel assemblies such as pods, roof trusses, panelised walls or floors, are composed of structural members and/or panels manufactured offsite. Prefabricated wall systems are one of the most popular modular systems in offsite construction industry [1][2][3].…”
Section: Introductionmentioning
confidence: 99%
“…Rapidly assembled panels are a form of modular construction, commonly used in residential buildings, as well as industrial structures [9][10][11]. A wide range of these panels are made from new lightweight components such as foams.…”
Section: Introductionmentioning
confidence: 99%