2021
DOI: 10.1016/j.rser.2021.111058
|View full text |Cite
|
Sign up to set email alerts
|

Hydropower development potential at non-powered dams: Data needs and research gaps

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 17 publications
(21 citation statements)
references
References 45 publications
0
19
0
Order By: Relevance
“…The reported NPD development potential corresponds to approximately 15% of the current total hydropower capacity. Other assessments have explored NPD development potential by using a variety of methods and levels of detail (Hansen et al 2021).…”
Section: Research Contextmentioning
confidence: 99%
See 3 more Smart Citations
“…The reported NPD development potential corresponds to approximately 15% of the current total hydropower capacity. Other assessments have explored NPD development potential by using a variety of methods and levels of detail (Hansen et al 2021).…”
Section: Research Contextmentioning
confidence: 99%
“…An analysis of several characteristics of dams in the NID reveals that some basic data are missing for large portions of the dam population. For example, normal storage capacity is only available for 91% of NPDs, and discharge at the dam is only available for 39% of NPDs (Hansen et al 2021). Examples of characteristics that might require additional research to generate the data are…”
Section: Data Gapsmentioning
confidence: 99%
See 2 more Smart Citations
“…SHPs using technologies that do not need a barrier (e.g., hydrokinetic turbines, Kirke 2019), or SH turbines that can be installed in existing infrastructures and in existing barriers (Hansen et al 2021) may reduce impacts substantially. Examples of plants exploiting existing infrastructures include water wheels in old mills (Quaranta and Revelli 2018), turbines in pressurized water distribution networks (WDNs) and in wastewater treatment plants (WWTPs) (Mitrovic et al 2021), and have installed capacity typically below 100 kW (micro hydropower).…”
Section: Introductionmentioning
confidence: 99%