“…It is doubtful that the drawdown rate would change significantly when the borehole was being pumped at a discharge rate that was far below its maximum yield. Transmissivities determined from the 24-hour specific-capacity estimates are within the range of estimates determined in other Yucca Mountain area wells (Thordarson, 1983;Thordarson and Howells, 1987;Plume and La Camera, 1996). Additional aquifer tests at higher discharge rates are needed to better define the transmissivity at this site.…”